摘要
在富水砂层中进行隧道施工前,须采取加固措施确保土体具有良好的自立性、止水性。通过分析高压旋喷桩、改进后的高压旋喷桩两种超前加固的效果,确定了翔安隧道穿越富水砂层时的浆液压力、浆液流量及旋喷提升速度的取值,同时指出加固材料、工艺具有适应性,为类似超前加固工程提供借鉴。
The measures must be taken to reinforce the soil to assure that it has good self-standing and sealing property before the tunnel goes through water-enriched sand stratum in the construction.Through the analysis of the advanced reinforcement effects of high-pressure jet grouting pile and improved high-pressure jet grouting pile,the slurry pressure,slurry volume and rotary jet lifting speed of Xiang’an Tunnel crossing the water-enriched sand stratum are determined,at the same time,it is pointed out that the reinforcement material and process have the adaptability for the similar advanced reinforcement engineerings to refer.
出处
《水利与建筑工程学报》
2013年第4期102-105,115,共5页
Journal of Water Resources and Architectural Engineering
基金
福建省教育厅基金(JA12202)
福建省自然科学基金(2011J01320)
关键词
富水砂层
高压旋喷桩
工艺参数
water-enriched sand stratum
high-pressure jet grouting pile
process parameter.