摘要
结合广州某下沉式广场基坑支护工程,介绍了PHC管桩与土钉支护方案的选定、施工工艺和施工注意的问题等。
This paper presents a case study of the combination of Pre-stressed High Strength Concrete (PHC) pile piles and the soil nails in supporting a deep excavation for a depressed square in Guangzhou City. The selection of the supporting scheme, construction techniques and the critical points during the installation are also introduced.
出处
《土工基础》
2013年第4期9-11,共3页
Soil Engineering and Foundation
关键词
PHC管桩
土钉
基坑支护
施工工艺
PHC Pipe Pile, Soil Nails, Deep Excavation Supports, Construction Techniques