摘要
工程变更直接影响到竣工结算造价,成为工程项目投资控制的关键。在工程施工阶段,工程变更方案的合理选择和变更费用的审查确定两个方面,是工程变更费用控制的重要手段。本文结合高速公路建设过程中的实际经验,分析工程变更费用的控制与确定措施。
Engineering change will directly affect the completion settlement cost, and become the key of project investment control. In the project construction phase, the reasonable choice and review of change cost of engineering change program is an important means of engineering change cost control. Combined with practical experience in the course of the construction of expressway, this paper analyses the cost of engineering change control and determination measures.
出处
《价值工程》
2013年第26期63-65,共3页
Value Engineering
关键词
工程变更
方案比选
费用审查
投资控制
engineering change
scheme comparison
cost review
investment control