摘要 随着北京地区基坑深度及单桩承载力要求的提高,基础施工面在不断向下移动,桩深度也在不断加深,使得施工情况也越来越复杂,如承压水的处理,相对水位的变化、地层的变化、施工设备的选择、场地的局限性等,针对这些问题,以北京地区某工程深桩基施工为例,介绍了承压水条件下,砂层、粉粘土层和卵石层多层互层复杂地质条件下的深桩基现场施工设备的选择和现场管理工作。介绍施工过程中的一些难点、要点及其解决方法。本研究可为类似工程提供参考。 Along with the foundation pit depth deepening and single pile bearing capacity requirements increasing, hmndation construc tion level is increasingly moving down, and pile depth as well. Thus make construction conditions increasingly complex, such as con fined water processing, relative water level variation, strata changing, construction equipment selection, site limitations etc. Aiming at these problems, taking a deep pile foundation construction in Beijing area as an example, have introduced deep pile foundation site con struction equipment selection and site management under confined water, multiple alternating sand, silt, clay and pebble beds complex geological conditions. Meanwhile, some difficulties during construction process, their essentials and methods of resolution introduced. The study can be used as reference for similar projects.
出处 《中国煤炭地质》 2013年第8期48-49,54,共3页 Coal Geology of China
关键词 深基础 复杂地层 桩基础施工 工程难点 应对措施 deep foundation complex strata pile foundation construction engineering difficulty coping measures
  • 相关文献

参考文献3

  • 1高大钊.桩基础的设计方法与施工技[M].北京:机械工业出版社,2000.
  • 2张晓炜,黄生根.钻孔灌注桩后压浆技术理论与虚用[M].北京:中国地质大学出版社,2011.
  • 3侯永富.混凝土桩基施工技术与质量管理[J].工程建设与技术,2009.(6):138-139.

同被引文献30

引证文献9

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部