摘要
为满足生产发展需要,对上海港罗泾港区二期工程煤炭码头升级改造。研究码头升级改造的必要性和可行性,并分析原有码头的平面布置和结构现状,提出码头平面改造方案,详细介绍改造工程的建设内容和总平面布置。改造后,卸船码头靠泊的船型从7万t级升级为12万t级,直取码头从靠泊5000t级船型升级为1万t级,装船码头从靠泊2000t级船型升级为1万t级。
In order to meet the demands of production and development, an upgrade reform on Shanghai Port Luojing Port Districts coal wharf is carried out. The necessity and feasibility of this wharf reform is analyzed. Then the plane and structure of original wharf are analyzed and the renovating plan of wharf plane is put forward. The construction contents and general plane layout of the engineering are introduced in detail. After reform the berth ship of unloading wharf is from 70 000 DWT to 120 000 DWT, that of direct wharf is from 5 000 DWT to 10 000 DWT, that of loading wharf is from 2 000 DWT to 10 000 DWT.
出处
《港口科技》
2013年第8期6-9,36,共5页
Port Science & Technology
关键词
港口
散货码头
升级改造
码头结构
port bulk cargo terminal upgrading renovation wharf structure