摘要
简要介绍了秦山核电二期工程蒸汽发生器主要专用吊装工具的设计。论述了吊装过程、翻转竖立方法、设计原则、设计规范、主要结构材料选用、结构与强度设计、应力分析和试验。这些专用吊装工具已成功地用于秦山核电二期工程 1号堆两台蒸汽发生器的吊装。
The design of the special lifting tools used for installing the steam generators (SG) of Qinshan Phase-Ⅱ is briefly introduced.The hoisting process,method of the SG upending,design principle,design code,selection of the major structure materials,design of the structure and the strength,stress analysis and the test are discussed.The special lifting tools have been used successfully to install the two SGs of reactor NO.1 of Qinshan Phase-Ⅱ .
出处
《核动力工程》
EI
CAS
CSCD
北大核心
2000年第5期416-420,429,共6页
Nuclear Power Engineering
关键词
秦山核电二期工程
蒸汽发生器
安装
吊装工具
Qinshan Phase-Ⅱ nuclear power project Steam generator installation Special lifting tools