摘要
交工技术文件既是工程质量验收的依据,也是充分发挥工程效益的凭证。交工技术文件的真实、准确直接影响到今后工程项目的维护、管理、改建、扩建等工作。因此,在工程文件归档前,建设单位档案部门要严格把关,从外观质量和内在质量两个方面入手认真审查,确保工程项目归档文件的齐全、完整、准确和系统。
Turnover technical document is the basis for the acceptance of construction quality,and also the certificate for giving full play to the benefit of the project.The accuracy and authenticity of turnover technical document directly affects the future maintenance,management,revamping and expansion of the project.Therefore,before the filing,the archives department in the construction company should strictly check the project documents from aspects of appearance quality and internal quality,so as to ensure that the project documents filed are complete,accurate and systematical.
出处
《石油化工设计》
CAS
2013年第3期62-64,70,共3页
Petrochemical Design
关键词
交工技术文件
归档
审查
Turnover technical document
Filing
Inspection