摘要 目前户外设备安装接地线的方法大部分是直接挂在设备引线上。受设备引线类型的限制,有时候挂接地线会非常困难。针对这一问题,介绍了一种可行的接地线安装方法,即在设备上延伸一小段导线作为挂接点,使挂接地线不受引线结构的限制,能简单、快捷、安全地完成接地线安装工作,缩短工作时间,降低工作风险。 Present method for installing grounding wire out of doors is to directly hang on equipment lead. For reason of restriction of types of equipment lead, it is sometimes very difficult to hang grounding wire. Aiming at this problem, this paper introduces one feasible new method for installing grounding wire which is to extend a section of wire on the equipment as mount point which may avoid restriction of lead structure so as to simply, rapidly and safely finish grounding wire installa- tion, shorten working time and reduce working risk.
作者 江伯顺
出处 《广东电力》 2013年第8期86-88,共3页 Guangdong Electric Power
关键词 变电站 操作 接地线 延伸 ., substation~ operation grounding wire extension
  • 相关文献

参考文献10

二级参考文献23

共引文献82

同被引文献28

引证文献7

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部