3LEE H S. An optimal algorithm for computing the max-min transitive closure of a Fuzzy similarity matrix[J].Fuzzy Sets and Systems,2001,(123):129-136.
4BI Z M,ZHANG W J. Modularity Technology in Manufacturing:Taxonomy and Issues[J].International Journal of Manufacturing Technology and Management,2001,(05):381-390.
5Gu P,Sosale S. Product modularization for life cycle engineering [ J]. Robotics and Computer Integrated Manufacturing, 1999,15 : 387 - 401.
6Ulrich K. The role of product architecture in the manufacturing firm [ J ]. Research policy, 1995,24 : 419 - 440.
7Stone R B, Wood K L, Crawford R H. A heuristic method for identifying modules for product architectures [ J ]. Design Studies,2000,21(1) ,5 -31.
8Salhieh S M,Kamrani A K. Macro level product development using design for modularity [ J ]. Robotics and Computer Integrated - Manufacturing, 1999,15:319 - 329.
9Tsai Y T. The development of modular-based design in considering technology complexity[ J]. European Journal of Operation Research, 1999,119:692 - 703.
10H.-E. Tseng, T.-S. Chang,Y.-C. Yang. A connector-based approach to the modular formulation problem for a mechanical product[ J]. The International Journal of Advanced Manufacturing Technology, 2004,24 ( 8 ) : 161 - 171.