该文介绍了上海白龙港污水处理厂污泥厌氧消化工程的调试过程,并对调试过程进行分析,总结了蛋形消化池在调试过程中遇到的问题及解决措施,以期为类似工程的调试提供参考。
The article introduces the adjusting process of the Sludge Anaerobic Digestion Project of Shanghai Bailonggang Wastewater Treatment Plant,analyzes the adjustment process,and sums up the problems met in the adjustment and the solving measures of the egg-shaped digestion tank in order to provide the reference for the adjustment of the similar projects.
出处
《城市道桥与防洪》
2013年第7期136-139,14,共4页
Urban Roads Bridges & Flood Control
关键词
污水处理厂
污泥处治
厌氧消化
运行调试
wastewater treatment plant,sludge disposal,anaerobic digestion,operation and adjustment