对大型越江隧道地下连续墙施工过程中出现的墙身质量问题及处理方案进行阐述,并提出了相应防治措施,有关经验可供相关专业人员参考。
The article sets forth the quality problems and treatment scheme in the construction of the diaphragm wall for the large-sized crossing-river tunnel,and puts forward the relative preventive measures.The relative experience can be referred for the similar projects.
出处
《城市道桥与防洪》
2013年第7期253-256,21,共4页
Urban Roads Bridges & Flood Control
关键词
越江隧道
地下连续墙
墙身质量
修复方案
crossing-river tunnel,diaphragm wall,wall quality,repair scheme