摘要
随着工程市场的迅速发展,建筑行业竞争日益激烈。工程项目由于具有很大的风险,因此造成很多项目的失败。业主和承包商的管理水平的高低,直接取决于工程招投标阶段的风险管理。由于招投标阶段的活动行为后果直接影响到后来的工程项目的实施。对此,该文认为必须对招投标阶段进行风险分析,并采取相应的管理措施,从而避免风险,有利于承包商进行准确报价和对风险采取有效的对策和计划,有利于项目目标的实现。
With the rapid development of engineering market,the competition is increasingly severe in the building industry.Many engineering projects often fail because of the great risks.The management level of the owners and the contractors will directly lie on the risk management of engineering bidding and tendering stages.The activity result of the bidding and tendering stages will directly impact the following implementation of engineering projects.Therefore,the article points out to analyze the risk of bidding and tendering stages and take the relevant management measures so as to avoid the risks,which are propitious to the contractors for correctly quoting the price and taking the efficient countermeasures and planning for the risks in order to realize the project objective.
出处
《城市道桥与防洪》
2013年第7期263-265,22,共3页
Urban Roads Bridges & Flood Control
关键词
公路工程
招投标
风险分析
管理
highway engineering,bidding and tendering,risk analysis,management