摘要
以上海地区为例,针对不同建筑面积、窗墙比、层高和人员密度4个影响因素对夏热冬冷地区车站候车室空调负荷进行了计算和分析,通过分析得出人员密度和建筑面积是影响候车室空调负荷的重要因素。
Taking Shanghai area as an example,air-conditioning load was calculated,and the result was analyzed for the station waiting room in hot summer and cold winter zone,which consider four factors such as construction area,area ratio of window to wall,storey height and occupant density.It concluded that the occupant density and construction area are main factors for air conditioning load.
出处
《建筑节能》
CAS
2013年第8期18-20,共3页
BUILDING ENERGY EFFICIENCY
关键词
候车室
空调负荷
影响因素
waiting room
air conditioning load
influencing factor