摘要
文章结合某高速公路连续刚构特大桥挂篮荷载试验工程案例,于常规方法之外,探讨利用已浇筑梁段前端为反力锚固点的新型实用的挂篮荷载试验方法。
In combination with practical engineering case of the hanging basket load test of continuous rigid frame super-large bridge in an expressway,and beyond the conventional methods,the article discussed the new practical hanging-basket load test method by using the front end of precast girder segment as the anchorage points of reaction force.
出处
《西部交通科技》
2013年第7期58-60,100,共4页
Western China Communications Science & Technology
关键词
连续刚构
挂篮
荷载试验
Continuous rigid frame
Hanging basket
Load test