摘要
通过探讨特高压工程定额的使用问题,并结合施工中遇到的实际情况,从运输距离、工程质量、工作经费等方面分析了影响特高压工程造价的原因,旨在为合理确定特高压工程造价提供依据。
According to the use of the UHV engineering quota,the paper analyzes the reasons for affecting the cost of the UHV projects by combining with the encountered circumstances,from the transmission distance,the engineering quality and the construction cost,so as to provide some reference for identifying the cost for the UHV project reasonably.
出处
《山西建筑》
2013年第27期221-222,共2页
Shanxi Architecture
关键词
特高压
工程造价
影响
UHV
engineering cost
influence