摘要 电网在应对由于外界因素引发的突发性停电事故时,如何快速合理地进行电力应急资源调度至关重要。讨论了局部电力系统恢复特征和制定对应的恢复策略需要考虑的问题,并在重点考虑负荷顺位的前提下,讨论了包含多个待恢复区域和多个资源供应点的电力应急物资综合调度问题。利用模糊层次分析法对待恢复区域的负荷重要性进行排序,得出负荷顺位,确定优先级;搭建以资源调度时间、成本和惩罚成本最小为多目标的应急资源调度模型,将待恢复区域优先级以赋权系数形式涵入模型,实现负荷顺位应急资源。最后用算例证明了模型的可行性和适用性。 In dealing with the sudden power blackout caused by external factors, power emergency resources allocation schedule plays a very important role. This paper discusses the characteristics of local outages in a power system and ttre kev points thai need to be considered in formulating corresponding restoration stralegies. To solve the inicgrated scheduling problems which ineludes multiple areas to be restored and multiple resource storehouses, the FAHP is used to sort out and sequence the areas to be restored aeeording to the load importance and the priority is determine accordingly. An emergency resources allocation schedule model is established by taking the minimum total time. total cost and penalty cost as objective, and the p,'iority of areas to be restored is added in the model in the form of weigilting coefficient. so as to enst,re the areas witil higher priority to obtain emergency ,'esources. In the end. a ease study proved the feasibility aud applicalfility of the ,nodel.
出处 《中国电力》 CSCD 北大核心 2013年第9期107-111,共5页 Electric Power
关键词 电力系统 电力应急 负荷顺位 资源调度 惩罚成本 power systenl power emergency load sequence resources allocation schedule penalty cost
  • 相关文献

参考文献12

二级参考文献144

共引文献225

同被引文献74

  • 1刘艳,顾雪平.基于节点重要度评价的骨架网络重构[J].中国电机工程学报,2007,27(10):20-27. 被引量:100
  • 2范明天,刘思革,张祖平,周孝信.城市供电应急管理研究与展望[J].电网技术,2007,31(10):38-41. 被引量:37
  • 3陈晓刚,孙可,曹一家.基于复杂网络理论的大电网结构脆弱性分析[J].电工技术学报,2007,22(10):138-144. 被引量:148
  • 4BABU C A, ASHOK S. Peak load management in electrolytic process industries [J]. IEEE Transactions on Power Systems, 2008, 23(2): 399-405.
  • 5WANG Z, GAO F, ZHAI Q, et ol. An integrated optimization model_ for generation and batch production load scheduling in energy intensive enterprise[C]//Power and Energy Society General Meeting, 2012 IEEE. IEEE, 2012: 1-8.
  • 6UUEMAA P, VALTIN J, KILTER J, et O1. Load control implementation in the energy intensive industry[C]//Mediterranean Electroteehnieal Conference (MELECON), 2014 17th IEEE. IEEE,2014: 213-218.
  • 7国家能源局.可再生能源发电并网驻点甘肃监管报告[R].2014.
  • 8XU J, LIAO S, SUN Y, MA X, et al. An isolated power system driven by wind-coal power for aluminum productions: a case study of frequency control [J]. IEEE Transactions on Power Systems, 2015, 30(1): 471-483.
  • 9KARGARIAN A, FU Y. System based security-constrained unit commitment using lagrange dual decomposition [J]. IEEE Transactions on Power Systems, 2014, 29(5): 2489-2498.
  • 10EMMANOUIL A B, PANDELIS N B, DIMITRIS P L, et all. Multiple time resolution unit commitment for short-term operations scheduling under high renewable penetration [J]. 1EEE Transactions on Power Systems, 2014, 29(1): 149-159.

引证文献5

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部