摘要 大五山施工隧洞中寒武系地层最长,工程地质问题突出,尤以断裂裂隙发育,地下水水位较高,涌水、涌砂、塌方、泥化等常见。施工前期、施工过程等不同阶段,采取不同的预防措施和适时处治工程,保证了工程进度和质量。 The distribution area of Cambrian strata the longest one in Dawushan tunnel construction. The engineering geological problems are prominent, especially the frequent development of fault and fissure, high level of underground water, welling, sand boil, collapse, etc. In the early period and other different stage of the construction, we have carried out different prevention measures and suitable processing building, which have ensured the construction progress and quality.
出处 《云南地质》 2013年第3期316-320,共5页 Yunnan Geology
基金 云南省技术创新人才培养对像资助项目(2010CI056)
关键词 工程地质特征 稳定性评价 施工预防措施 寒武系地层 牛栏江-滇池补水工程 Engineering Geology Feature Cambrian Strata Stability of Wall Rock Stability Assessment Engineering of Niulanjiang River - Dianchi Lake Water Supply
  • 相关文献

参考文献3

  • 1李术才,李树忱,张庆松,薛翊国,丁万涛,钟世航,何发亮,林玉山.岩溶裂隙水与不良地质情况超前预报研究[J].岩石力学与工程学报,2007,26(2):217-225. 被引量:302
  • 2中国水电顾问集团昆明勘测设计研究院.牛栏江-滇池补水工程初步设计报告(糟家湾-昆明段)[R].2010.2009.
  • 3GB50487-2008,水利水电工程地质勘察规范[S].北京:中国计划出版社,2009.