摘要
分析长春市城市交通特点,结合城市实际情况及轨道交通线网规划,阐述其发展规划与建设实践,包括已建成并运营的长春轻轨一、二、三期工程以及长春地铁1、2号线工程的规划和建设;分析轻轨工程的内容及主要技术指标,论述长春轻轨的特点;从长春市轨道交通发展的角度,针对轻轨建设中存在的问题提出改进措施。
The article analyses the features of Changchun urban rail industry, and according to the city situation and rail transit network planning, elaborates the implementation of planning and construction including the constructed and operated first-, second-, and third-phase of light rail projects and the first-phase and second-phase planning and construction of the subway lines. The content and technical specifications of light rails are analysed with the features of Changchun light rails described. Several proposals are put forward in order to provide guidance for the light rail construction from the perspective of the development of Changchun