基于项目团队效能评估的关键链动态缓冲设置研究 被引量:3

Research on dynamic critical chain buffer sizing based on evaluation of project team effectiveness
下载PDF
导出
摘要 缓冲对于吸收关键链中的不确定性起到重要作用,而项目团队效能的阶段性特征以及不稳定的动态变化给缓冲设置带来诸多不确定性问题。提出了一种考虑项目团队效能的动态缓冲设置方法,该方法通过评估项目团队动态效能,设定项目团队效能调整系数,对缓冲进行动态设置,使缓冲更具针对性和灵活性。通过算例介绍了该方法的使用过程,并通过MATLAB模拟证实了该方法的有效性和实用性。 Buffer plays an important role to absorb the uncertainty in the critical chain. However, stage characteristics and unstable dynamic changes of the team effectiveness bring various uncertain problems to buffer sizing. A dynamic buffer sizing based on evaluation of project team effectiveness method is proposed to deal with these problems. The method sizes buffer dynamically through evaluating project team effectiveness and setting team effectiveness coefficient, which make the proposed method more realistic and flexible. Finally, a case study is carried out to demonstrate application of the proposed method. And MABTLAB is conducted to validate effectiveness and practicability of the proposed method.
出处 《机械》 2013年第9期22-27,共6页 Machinery
基金 中央高校基本科研业务费科研专项自然科学类面上项目(CDJZR10110020)
关键词 关键链 缓冲 团队效能 项目管理 critical chain buffer team effectiveness project management
  • 相关文献

参考文献16

  • 1高德拉特.关键链[M].北京:电子工业出版社,2006.
  • 2Herroelen W., Leus R.. On the merits and pitfalls ofcritical chain scheduling[J]. Journal of Operations Management, 2001, 19 ( 5 ) : 559-577.
  • 3Leach L. P. Critical Chain Project Management (Second edition) [M]. London: Artech House Inc, 2005.
  • 4Tukel O. 1., Rom W. O., Eksioglu S. D.. An investigation of buffer sizing techniques in critical chain scheduling[J]. European Journal of Operational Research, 2006, 172 ( 2 ) : 401-416.
  • 5Rabbani M., Ghomi S. M. T., Jolai F., Lahiji N. S.. A new heuristic for resource constrained project scheduling in stochastic networks using critical chain concept[J]. European Journal of Operational Research, 2007, 176 ( 2 ) : 794-808.
  • 6Blackstone J'. H., Cox J. F., Schleier J. G.. A tutorialon project management from a theory of constraints perspective[J]. International Journal of Product Research, 2009, 47 (24) : 7029-7046.
  • 7TUKEL O I, ROM W O, EKSIOGLU S D. An investigation ofbuffer sizing techniques in critical chain scheduling[J]. European JournalofOperational Research, 2006, 172 (2) : 401-416.
  • 8杨立熙,李世其,黄夏宝,彭涛.属性相关的关键链计划缓冲设置方法[J].工业工程与管理,2009,14(1):11-14. 被引量:36
  • 9林晶晶,周国华.基于工序不确定性的关键链缓冲设置方法研究[J].科技管理研究,2011,31(2):227-230. 被引量:9
  • 10别黎,崔南方.关键链多项目管理中能力约束缓冲大小研究[J].计算机集成制造系统,2011,17(7):1534-1540. 被引量:30

二级参考文献68

  • 1唐建波,关昕,马力.关键链技术研究与基于关键链的项目管理系统[J].计算机工程与设计,2004,25(11):2077-2080. 被引量:20
  • 2赵道致,廖华.对关键链法的几个认识误区[J].工业工程,2005,8(2):4-6. 被引量:24
  • 3杨雪松,胡昊.基于关键链方法的多项目管理[J].工业工程与管理,2005,10(2):48-52. 被引量:63
  • 4刘士新,宋健海,唐加福.资源受限项目调度中缓冲区的设定方法[J].系统工程学报,2006,21(4):381-386. 被引量:70
  • 5蒋国萍,陈英武.基于关键链的项目进度问题研究[C]//章祥荪,王建方,刘宝碇,等.中国运筹学会第七届学术交流会论文集.香港:Global-Link,2004:719-724.
  • 6Rand G K. Critical Chain= The Theory of Constraints Applied to Project Management [J]. International Journal of Project Management, 2000,18(3) : 173-177.
  • 7Steyn H. Project Management Applications of the Theory of Constraints beyond Critical Chain Scheduling[J]. International Journal of Project Management, 2002,20( 1 ) : 5.
  • 8Steyn H. An Investigation into the Fundamentals of Critical Chain Project Scheduling [J]. Internationai Journal of Project Management, 2000,19 (6) : 363-369.
  • 9Tukel O,Rom W, Eksioglu S. An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling[J]. European Journal of Operational Research, 2006,1 7 2 (2) : 401-416.
  • 10Leach L P. Critical Chain Project Management [M]. Boston: Artech House, 2000.

共引文献167

同被引文献21

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部