摘要
本文分析了费县许家崖水库大坝心墙存在的问题及成因,并运用当今先进的防渗加固技术,通过方案对比,择优进行心墙设计,最终确定选用塑性混凝土防渗板墙进行加固。
This paper analyzes problems and formation causes of Feixian County Xujiaya Reservoir dam core wall. Cun'ent advanced anti-seepage reinforcement technology is used for optimally designing the core wall. Through scheme comparison, it is ultimately determined that plastic concrete cutoff wall is adopted for reinforcement.
出处
《水利建设与管理》
2013年第8期36-38,35,共4页
Water Conservancy Construction and Management
关键词
防渗
混凝土板墙
心墙设计
anti-seepage
concrete cutoff wall
core wall design