摘要
结合武广、石武客运专线接口管理的实际经验,着重阐述了在高速铁路建设中站前预留站后四电接口工程的重要性和各类接口在各阶段施工过程中的施工要点,并对重点的接口项目提出了建设性的建议,以确保接口工程的施工质量。
Combining with the factual experience of the interface management along Wuhan-Guangzhou and Shijiazhuang-Wuhan passenger rail- way line, the paper mainly illustrates the importance of the interface projects for the telecommunication, the signal, the power and the electric be- fore the preparation stations during the express railway construction and the construction points for all kinds of interface in the construction process of all stages, and points out some suggestions for the key interface projects, so as to ensure the construction quality of interface projects.
出处
《山西建筑》
2013年第29期139-140,共2页
Shanxi Architecture
关键词
高速铁路
接口
管理
express railway, interface, management