摘要
根据山西省风电场占地特点和风电场建设时对植被的破坏方式,依据国家相关法律法规,从风电场不同占地类型出发,并结合风电场建设实例,分析了风电场占地在占用不同植被类型时,在建设后期植被恢复时应该采取的不同恢复措施,以供参考。
According to Shanxi wind power filed occupation features and damage methods of wind power field construction upon vegetation, based on relevant domestic laws and regulations, starting from different wind power generation field occupation styles, combining with wind power field construction examples, the paper analyzes various measures needing apply in post construction revegetation of wind power filed occupation, with a view to provide some guidance.
出处
《山西建筑》
2013年第29期181-182,共2页
Shanxi Architecture
关键词
风力发电
占地
植被恢复
措施
wind power generation, land occupation, revegetation, measure