北京地下直径线大断面暗挖隧道衬砌施工技术 被引量:4

Lining Technology for Large Cross-section Tunnel Constructed by Mining Method in Urban Area: Case Study on Underground Tunnel Connecting Beijing Railway Station and Beijing West Railway Station
下载PDF
导出
摘要 为解决复杂边界条件下大断面暗挖隧道衬砌施工方法选择的问题,针对北京站—北京西站地下直径线洞桩法隧道段和CRD法隧道段的衬砌具体项目,从施工效率、经济性和沉降变形控制等方面进行研究。主要得出以下结论:1)组合钢模和模板台车2种施工方法各有其适用性和局限性,应根据开挖方法、断面尺寸和作业环境等合理选用;2)对2种施工方法在安全质量控制措施上进行了相关补充完善,可为类似工程提供参考。 Different lining methods are studied in terms of lining efficiency,economy and settlement and deformation control,so as to select proper lining methods for the PBA section and CRD section of the underground tunnel connecting Beijing Railway Station and Beijing West Railway station.Conclusions drawn are as follows: 1) Both composite steel formwork lining method and formwork trolley lining method have their own applicability and limitations and should be rationally selected according to the excavation methods,cross-section dimensions and environment of the tunnel.2) The mentioned two lining methods are optimized in terms of safety and quality control.The paper can provide reference for similar projects in the future.
作者 雷宏亮
出处 《隧道建设》 2013年第8期684-689,共6页 Tunnel Construction
关键词 北京地下直径线 大断面隧道 衬砌 组合钢模 模板台车 洞桩法 CRD法 Beijing underground railway large cross-section tunnel lining composite steel formwork formwork trolley PBA method CRD method
  • 相关文献

参考文献9

二级参考文献18

共引文献38

同被引文献22

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部