期刊文献+

背栓式叠型干挂石材幕墙的施工工艺与质量控制 被引量:5

Construction technique and quality control of back-bolt imbricate dry hanging stone curtain wall
下载PDF
导出
摘要 为进一步改进背栓式连接石材干挂工艺,使其在石材幕墙工程中应用更加广泛,获得更加独特美观的外墙装饰效果,结合寿光市文化中心外墙装饰工程的施工做法,总结并提出了一种背栓式叠型干挂石材幕墙的施工工艺,阐述了确保该工艺施工质量的措施,以期为类似工程提供借鉴. To further improve back-bolt dry hanging stone process,make its application more widely in the stone curtain wall engineering and get more unique and beautiful exterior adornment effect,this article summarizes and proposes a back-bolt imbricate dry hanging stone curtain wall construction technology by combining the exterior wall decoration engineering construction practice of the cultural center in Shouguang,and expounds the measures to ensure the quality of the construction process,in order to provide references for similar projects.
出处 《山东理工大学学报(自然科学版)》 CAS 2013年第3期75-78,共4页 Journal of Shandong University of Technology:Natural Science Edition
关键词 石材幕墙 干挂技术 背栓式 施工工艺 质量控制 stone curtain wall dry hanging technology back-bolt construction technology quality control
  • 相关文献

参考文献7

二级参考文献11

共引文献25

同被引文献13

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部