三峡升船机塔柱混凝土施工测量技术

Construction survey technology on concrete constructionof Three Gorges Project ship lift tower
下载PDF
导出
摘要 针对三峡垂直升船机高薄壁塔柱结构混凝土形体及内置埋件施工精度指标要求,对三峡升船机塔柱混凝土及内置埋件施工测量中的平面、高程基准传递及埋件定位测量方法进行了研究。分别将天顶仪投点、电磁波测距及中心带照准标志的圆柱螺帽型定位装置施工测量技术运用于混凝土结构尺寸控制测量以及内置埋件定位测量。通过对实测数据的统计与分析,证明三峡升船机塔柱混凝土施工测量技术方案具有可靠性和可行性。 Three Gorges Project vertical ship lift is high-walled tower structure. According to the preci-sion requirements of construction for concrete body and built-in embedded parts, the plane, elevation datum transmission and positioning measurement methods for embedded parts in construction survey of concrete and built-in embedded parts of Three Gorges Project ship lift tower were studied. The construction survey technolo-gies, including zenith telescope planar cast point, electromagnetic distance measuring and cylindrical nut type positioning device with a sighting mark in center are applied to size-control measurement for concrete structure and positioning measurement for built-in embedded parts respectively. Through the statistical analysis on the mea- sured data, the construction survey technology solutions for concrete construction of Three Gorges Project ship lift tower are proved to be reliable and feasible.
作者 罗琛 晏春波
出处 《中国工程科学》 北大核心 2013年第9期97-101,共5页 Strategic Study of CAE
关键词 施工测量 天顶仪投点 电磁波测距 套管空间定位测量 三峡升船机 construction survey zenith telescope cast point electromagnetic distance measuring spa-tial positioning measurement for casing Three Gorges Project ship lift
  • 相关文献

参考文献3

  • 1李青岳,陈永奇.工程测量学[M].3版.北京:测绘出版社,2008.
  • 2国家能源局.DL/T5173-2012水电水利工程施工测量规范[s].北京:中国电力出版社,2012.
  • 3中华人民共和国建设部.GB50026-2007工程测量规范[S].北京:中国建筑工业出版社,2007.

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部