三峡升船机塔柱施工期变形监测 被引量:4

Deformation monitoring on Three Gorges Project ship lift tower during construction period
下载PDF
导出
摘要 从控制监测过程中的内部、外部要素以及现场作业条件着手,通过对几种典型监测方法精度分析及360°反射棱镜试验研究,最终选择全站仪极坐标法作为三峡升船机塔柱施工期变形监测的方法,并对运用该方法得到的长期监测数据成果进行了变形规律分析。分析结果表明:塔柱变形受温度影响大,温差越大,变形越大,温差小或恒温状态时变形很小甚至没有变形。 This paper begins with internal and external factors as well as field operating conditions during the monitoring process. According to the accuracy analysis which is done to several typical monitoring methods and the study which is done to the 360° reflecting prism test, the final choice is that total station polar coordinate would be used as the deformation monitoring method of Three Gorges Project ship lift tower during construction period, and deformation analysis is received using the long-term monitoring data obtained by the use of the meth-od. The results show that tower deformation is greatly affected by temperature; the greater the temperature differ- ence, the greater the deformation. It would be small deformation or even no deformation when temperature differ-ence is small or under constant temperature.
作者 邱章云 罗琛
出处 《中国工程科学》 北大核心 2013年第9期102-107,共6页 Strategic Study of CAE
关键词 三峡升船机 塔柱 变形监测 全站仪极坐标法 Three Gorges Project ship lift tower column deformation monitoring total station polarcoordinate
  • 相关文献

参考文献3

  • 1李青岳,陈永奇.工程测量学[M].第3版.北京:测绘出版社,2008.
  • 2国家能源局.DL/T5173-2012水电水利工程施丁测量规范[S].北京:中国电力出版社,2012.
  • 3中华人民共和国国家经济贸易委员会.DL/T5178-2003混凝土坝安全监测技术规范[S].北京:中国电力出版社,2003.

同被引文献32

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部