期刊文献+

电网企业ERP设备资产数据清理实施方法与应用

Implementation Methods and Application of ERP Equipment Assets Liquidation for Power Grid Enterprises
下载PDF
导出
摘要 针对电网企业ERP项目实施过程中设备资产数据清理难题,文章建立了设备资产数据清理流程模型,提出了"四全八法六个流程"工程实施方法论,阐述了数据清理过程中纠错和工作评估方法。该清理实施方法成功应用在辽宁电力ERP项目实施中,大大提高了设备资产清理和核对工作的效率和效益。 To fulfill the arduous task of equipment assets liquidation during implementation of ERP projects for grid enterprises, this paper builds a model of equipment assets liquidation process, and proposes a methodology of project implementation, which includes four steps, eight methods and six processes. It also describes how to correct errors and assess efforts during assets liquidation. The methodology is successfully applied in ERP project of Liaoning Electric Power Company Limited, which effectively improves the working efficiency and profit on equipment assets liquidation and check.
出处 《电力信息与通信技术》 2013年第7期91-95,共5页 Electric Power Information and Communication Technology
关键词 设备资产 数据清理 ERP实施 方法论 equipment assets data clearance ERP project implementation methodology
  • 相关文献

参考文献5

二级参考文献4

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部