大茶山高瓦斯隧道施工通风设计 被引量:10

Design on construction ventilation for Dachashan tunnel with high concentration of gas
下载PDF
导出
摘要 新建沪昆客运专线铁路大茶山高瓦斯隧道斜井及正洞施工采用钻爆法,采用了压入式、抽出式及全负压巷道式相结合的分阶段通风方案。依据通风标准,对作业面施工需风量、风压、风机供风量进行了计算,并提出通风设备参数要求。所采用的通风方案通风量大,稀释快,排烟时间短,充分满足了稀释瓦斯和排除烟尘的要求。隧道开挖作业环境好,极大提高了工作效率,保证了隧道的施工质量、进度和施工安全。 The incluned shafts and main tunnel of Dachashan high gas tunnel on the currently ander- construction Shanghai-Kunming passenger-dedicated railway has adopted drilling-and-blasting method in it construction, during which a total of three ventilation schemes, namely forced ventilation, exhaust ventilation and all-negative gallery ventilation, have been introduced supplementarily and successively. The air volume in need, air pressure, air volume supplied by the blower on the operation face have been measured and calculated in accordance with the ventilation standard and the equipement parameters have proposed accordingly. The scheme applied features ample air supply,which satifies the needs of diluting gas and discharging smoke. Its high efficiency creates a favourable construction environment, which largely accelerate the working pace. As a result,it ensures both the project quality and its safety.
作者 白俊 雷建华
出处 《铁道建筑》 北大核心 2013年第9期39-41,共3页 Railway Engineering
关键词 沪昆客运专线 高瓦斯隧道 通风设计 Shanghai-Kunming passenger-dedicated railway High gas tunnel Ventilation scheme
  • 相关文献

参考文献6

二级参考文献13

  • 1中华人民共和国铁道部.TB10120-2002铁路瓦斯隧道技术规范[S].北京:中国铁道出版社,2002.
  • 2中华人民共和国煤炭部.煤矿安全规程[S].北京:煤矿工业出版社,2006.
  • 3[1]TB10120-2002,铁路瓦斯隧道技术规范[S].
  • 4山西省岩石力学与工程学会太原理工大学采矿研究所.瓦窑岭隧道瓦斯安全性评价.
  • 5交通建设工程安全监理[M].北京:人民交通出版社,2007.
  • 6TB10120-2002.铁路瓦斯隧道技术规范[S].[S].,..
  • 7JTGD70-2004.公路隧道设计规范[S].[S].,..
  • 8JTJ042-94.公路隧道施工规范[S].[S].,..
  • 9TB 10068-2000,铁路隧道运营通风设计规范[S].
  • 10中华人民共和国铁道部.TB10120-2002,铁路瓦斯隧道技术规范[S].北京:中国铁道出版社,2003.

共引文献47

同被引文献110

引证文献10

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部