摘要
首台国产核电安注箱设备的设计和制造无先期经验和现存资料,存在较多不确定的质量控制因素。为了确保安注箱的制造和验收符合标准要求,根据制造过程对质量控制流程进行了策划,确定质量控制要点。结合生产实践,提出了压制、装配、焊接和水压试验作为关键控制点。通过对整个制造过程有效的质量控制和检验,达到了核电产品的质量要求,为类似产品的质量管理提供借鉴。
There were no experience and extant data on design and manufacture for the first localized accumulator tank in the country and there were also many uncertain factors for the quality control. In order to insure the fabrication, inspection and acceptance to meet the standard, a quality control plan for manufacturing was worked out and the key points of quality control were determined. Combined with production practice, the procedures of forming, assembly, welding and hydraulic test were put forward. Product quality has been improved by effective quality control and inspection. It will be provide as the reference for the quality management of similar equipment.
出处
《电站辅机》
2013年第3期17-21,共5页
Power Station Auxiliary Equipment
关键词
核电站
安注箱
装配
过程
产品管理
质量
控制
检验
nuclear power station
accumulator tank
assembly
procedure
product control
quality
control
inspection