综合接入光路不通的故障分析与探讨

Fault analysis of integrated access to the optical path
下载PDF
导出
摘要 文章叙述了在某站点综合接入的从框设备搬迁到户外组网时,开V5时不能实现主次链路倒换、发倒换命令时出现通信中断等故障现象。从案例实际出发,结合理论知识对ZXA10综合接入设备开V5时不能实现主次链路倒换等问题现象进行了全面的分析,为技术维护人员提供了解决ZXA10综合接入设备故障处理问题提供了一种参考。 This paper describes the fault phenomenon with V5 that when moving the integrated access equipment from the frame to outdoor networking, the primary and secondary link switching can not be achieved and the communication interrupt occurs with the switching instruction. From the actual case and combined with the theoretical knowledge, this paper fully analyzes the phenomenon with the ZXAIO integrated access equipment, which provides a reference to solve the troubleshooting problems for the technical maintenance personnel.
出处 《长沙通信职业技术学院学报》 2013年第3期19-21,共3页 Journal of Changsha Telecommunications and Technology Vocational College
关键词 V5 链路 倒换 信令 VS link switch signaling
  • 相关文献

参考文献6

  • 1孙强,周虚.光接入网技术及其应用[M].北京:北京交通大学出版社.2007.
  • 2钱宗钰,区惟煦,寿国础.光纤接入网技术及其应用[M].北京:人民邮电出版社.2001.
  • 3弗朗斯.本地接入网技术[M].北京:电子工业出版社,2005.
  • 4ZTE中兴.ZXJl0数字程控交换机[Z].外包商高级培训教材.
  • 5华为技术.V5信令专题ISSUE1.2[Z].
  • 6中国电信集团公司.V5.2接口应用技术规定[Z].2000.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部