期刊文献+

锌湿法冶炼过程中除铁方法的研究进展 被引量:19

PROGRESS OF RESEARCH ON METHODS OF REMOVING IRON FROM ZINC HYDROMETALLURGICAL PROCESS
下载PDF
导出
摘要 湿法炼锌厂产出的铁渣量大,不仅含有H2SO4,而且还有Cu、Cd、Pb、Zn、In、As、Sb、F、Cl等有害杂质,长期堆存会造成环境污染和资源浪费,必须加强研发渣的无害化处理和回收方法。本文综合论述了国内外各种除铁方法和最新进展,可为湿法炼锌厂的除铁工艺选择提供参考。针铁矿法、赤铁矿法、渣中铁的深加工方法最有可能实现渣的无害化处理,值得重点开发和应用。 The residue in a zinc hydrometallurgy plant is very large in volume, and contains harmful substances such as H2SO4, Cu, Cd, Pb, Zn, In, As, Sb, F, Cl et al. Long-term storage will cause environmental pollution and means waste of resources. So the harmless treatment and recycling method of the residue should be studied with greater effort. This paper summarizes various methods of removing iron and the latest developments at home and a- broad, which provides reference to the new plants of zinc hydrometallurgy in the respect of iron removal technology selection. The goethite method, hematite method, deep processing of iron in the residue should be developed and applied, which are most likely to reach the goal of harmless treatment.
出处 《矿冶》 CAS 2013年第3期71-74,共4页 Mining And Metallurgy
基金 云南省教育厅科学研究基金项目(2013Y068)
关键词 湿法炼锌 除铁 针铁矿 zinc hydrometallurgy iron removal goethite
  • 相关文献

参考文献37

  • 1梅光贵,王德润,周敬元,等.湿法炼锌学[M].长沙中南大学出版社,2001.
  • 2王顺才,张豫.热酸浸出黄钾铁矾工艺的生产实践[J].有色冶炼,2001,30(2):19-22. 被引量:27
  • 3Elgersma F, Witkamp G J, Van Rosmalen G. Simultaneous dissolution of zinc ferrite and Precipitation of ammonium jarosite[ J]. Hydrometallurgy, 1993, 34(1) :23-47.
  • 4Dutrizac J E. Effect of seeding on the rate of precipitation of ammonium jarosite and sodium jarosite[ J]. Hydrometal- lurgy, 1996, 42(3) : 293-312.
  • 5Elgersma F, Witkamp G J, Van Rosmalen G M. Incorpora- tion of zinc in continuous jarosite Precipitation[ J]. Hydro- metallurgy, 1993, 33 (3) :313-339.
  • 6刘三平,王海北,蒋开喜,冯亚平,黄胜.含锌铁钒渣的回收利用[J].矿冶,2009,18(1):23-28. 被引量:8
  • 7Niekerk V, Johannes C. Thermal precipitation of iron from sulphate solutions [ J ] . Mining& Metallurgical Inst of Ja- pan, 1985, 33(10) :691-706.
  • 8RoPenaekAV湿法炼锌中沉铁的作用[J].王锦发,译.重有色冶炼,1980(4):21-25.
  • 9RoPenaekAV.达特伦电锌厂的改建[J].罗尧谦,译.有色冶炼,1988(3):16-23.
  • 10余楚蓉.用针铁矿法改造现有的大型电锌厂浸出渣的处理流程[J].中国有色冶金,1983(2):7-13.

二级参考文献46

共引文献161

同被引文献411

引证文献19

二级引证文献78

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部