2Deckmann S, Pizzolante A, Monticelli A et al. Numerical testing ofpower system load flow equivalents [ J ] . IEEE Trans on Power Apparatus andSystems,1980,PAS-99(6) :2292 -2300.
3Deckmann S,Pizzolante A,Monticelli A. Studies on power system loadflow equivalencing[ J] , IEEE Trans on Power Apparatus and Systems, 1980,PAS-9(6) :2301 -2310.
4Shoults R R, Bierck W J. Buffer system selection of a steady 一 stateexternal equivalent model for real-time power flow using an automated ensitiv-ity analysis procedure [ J ] . IEEE Trans on Power Systems, 1988,3 (3 ):1104-1111.
5Costa A J A S, Arze M T. Critical pseudo - measurement selection forunreduced external system model [ J ] . Electrical Power & Energy Systems,1996,18(2) :73 -80.
6Lu C N, Liu K C. An external network modeling approach for onlinesecurity analysis [ J ] . IEEE Trans on Power Systems, 1990,5(2) : 565 -573.