干燥粉细砂隧道超前预加固与施工研究 被引量:13

PRE-REINFORCEMENT AND CONSTRUCTION OF TUNNEL IN DRY FINE SAND LAYERS
下载PDF
导出
摘要 大西铁路客运专线上白隧道穿越干燥粉细砂地层,施工难度及风险很大。通过现场密排小导管和深层咬合桩预加固效果对比试验,得出深层咬合桩预加固可有效控制开挖中的流砂及涌砂。同时,对粉细砂地层及深层咬合桩固结体进行直剪试验、三轴试验及侧限压缩试验等室内试验,得到地层及固结体的各项物理力学指标,且认为三轴试验所得各指标更为真实、可靠。在此基础上,对干燥粉细砂地层隧道开挖方法进行数值模拟和现场试验测试,提出合理的施工方法建议。研究结果为上白隧道施工提供技术支持,也可供类似工程参考。 Shangbai large cross-section tunnel in Datong-Xi'an Passenger Dedicated Lines passes through dry fine sand layers. Its construction technologies are difficult and risky. Through the comparative field experiments of close-packed small pipe and deep secant pile of pre-reinforcement, it is found that the deep secant pile pre-reinforcement scheme can effectively control the quick sand and sand gushing during the tunnel excavation. Meanwhile the physico-mechanical parameters of the fine sand layers and consolidation body are obtained by deep secant pile test through laboratory tests, including direct shear tests, triaxial tests and unconfined compression tests. On this basis, through the numerical simulation and field test of tunnel excavation method in dry fine sand layers, the reasonable construction scheme is proposed. The results can provide technical support for Shangbai tunnel construction and reference for similar projects.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2013年第9期1909-1916,共8页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金资助项目(51078243) 河北省自然基金资助项目(E2012210011)
关键词 隧道工程 干燥粉细砂地层 预加固 施工 tunnelling engineering dry fine sand layers pre-reinforcement construction
  • 相关文献

参考文献14

二级参考文献67

共引文献179

同被引文献110

引证文献13

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部