摘要
针对水下冲孔灌注桩通过斜面岩层成孔困难、易出现斜孔、施工进度慢等情况,本文介绍斜面岩层爆破成孔技术及取得的经济效益,为水下冲孔灌注桩通过斜面岩层施工提供借鉴。
It is difficult to use conventional techniques for underwater construction of punched cast - in - situ piles at inclined stratums, which would cause problems such as tilted holes and low construction efficiency. This paper introduces a coring by blast technique which has the potential of providing economic benefits.
出处
《福建建设科技》
2013年第5期30-32,共3页
Fujian Construction Science & Technology
关键词
冲孔灌注桩
水下
斜面岩层
爆破成孔
Cast - in - situ pile
Underwater construction
inclined stratum
coring by blast