摘要 通过10 kV配电网运行方式调整优化区域电网容载比时,无法直观的看到调整后各变电所容载比的变化情况。利用海迅实时数据库开发了一个辅助软件,模拟运行方式调整,分析各变电所容载比的变化情况,为优化区域电网容载比提供依据,也为主变增容布点提供依据。 When adjusting and optimizing capacity-load ratio of regional power grid by means of operating mode of 10 kV distribution networks, it is unable to intuitively see the change of capacity-load ratio of sub- stations. With the help of HighSoon Real-time database, the aid software is developed to simulate the adjust- ment of operating mode and analyze the change of capacity-load ratio of substations, which provide basis for optimizing capacity-load ratio of regional power grid and location distribution for capacity increase of main transformers.
作者 刘新斌
机构地区 长兴县供电局
出处 《浙江电力》 2013年第9期57-59,共3页 Zhejiang Electric Power
关键词 海迅实时数据库 主变 容载比 优化 方式调整 HighSoon Real-time Database main transformer capacity-load ratio optimization mode ad-justment
  • 相关文献

参考文献1

  • 1史兴华.供电企业实时/历史数据库PI典型应用案例[M].北京:中国电力出版社,2009.

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部