摘要
针对总承包项目中项目合同期限较短这一普遍存在的事实,结合工程实例,从前期招标、过程控制、数据库建立等阶段,提出与之相适合的费用控制方法。
It is a general fact that the EPC project often has a tight deadline. Combining with the experience of other projects, some proper cost control methods were put forward for the initial tendering, process control and cost database establishment.
出处
《中国矿山工程》
2013年第5期62-64,共3页
China Mine Engineering