介绍了1000MW发电机组无烟气旁路的烟气脱硫系统优化设计方案,调试、运行期间遇到的问题,以及针对无烟气旁路脱硫系统特点采取提高系统可用率采取的措施。
This paper introduces the optimization design of FGD (flue gas desulfurization) system without bypass for the coal fired power plant 1000MW, and the problems encountered during debugging, and against the characteristics of FGD system without bypass the measures were taken.
出处
《装备机械》
2013年第3期49-54,共6页
The Magazine on Equipment Machinery