期刊文献+

基于平衡计分卡的水电施工企业绩效评价 被引量:1

Balanced scorecard based performance evaluation on hydropower construction enterprise
下载PDF
导出
摘要 本文主要研究了基于平衡计分卡的水电施工企业的绩效评价体系。首先介绍了研究的意义、目的,以及国内外的研究现状。然后,以某水电施工企业为例,基于平衡计分卡设计了具体的绩效评价指标。最后,提出了促进水电施工企业有效运用平衡计分卡的建议。 The balanced scorecard based performance evaluation system of hydropower construction enterprise is mainly studied herein. Firstly, the significance and purpose of this study as well as the study status at home and abroad are described, and then the specific indexes for the performance evaluation are designed based on balanced scorecard by taking a hydropower construction enterprise as the study case, finally, some suggestions to promote the effective application of the balanced scorecard to hydropow- er construction enterprise are put forward as well.
作者 马莹
出处 《水利水电技术》 CSCD 北大核心 2013年第9期86-89,共4页 Water Resources and Hydropower Engineering
关键词 水电施工企业 绩效评价 平衡计分卡 层次分析法 hydropower construction enterprise performance evaluation balanced scorecard analytic hierarchy process
  • 相关文献

参考文献4

  • 1Gretchen B Jordan, John C Mortensen. Measuring the performance of research and technology programs: A balanced scorecard approach [J]. The Journal of Technology Transfer, 1997, 22(2) : 13-20.
  • 2Andrew C Worthington, Tracey West. Economic Value-Added: A Review of the Theoretical and Empirical Literature[ J]. Asian Review of Accounting, 2001, 9(1): 67-86.
  • 3张媛.建筑施工企业项目绩效评价[J].管理论坛,2011,29(4):136-139.
  • 4许炳,于浩.基于平衡记分卡的建筑施工企业项目管理绩效评价研究[J].建筑经济,2008,29(S2):71-74. 被引量:12

二级参考文献6

共引文献11

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部