摘要
介绍了三峡左岸ALSTOM机组水导外循环冷却系统的结构和特点,重点分析了ALSTOM机组水导冷却系统存在的问题。通过技术改造,ALSTOM水轮发电机组水导冷却系统的问题基本得到了解决,为三峡电厂的安全运行创造了条件。
This article describes the structure and characteristics of ALSTOM unit water guide bearing cooling system in Three Gorges Left Bank Power Station, focus on analyzing of the problems of ALSTOM unit water guide bearing cooling system. These problems have been resolved by a variety of technological transformation. As a result, making a safe condition for the operation of Power Plant.
出处
《水利水电技术》
CSCD
北大核心
2013年第9期105-107,110,共4页
Water Resources and Hydropower Engineering
关键词
三峡左岸电站
水导冷却系统
改造
Three Gorges Left Bank Power Station
water guide bearing cooling system
transformation