期刊文献+

1×30MW生物质电厂主厂房布置特点

Characteristics of Main Building Arrangement in 1×30MW Biomass Power Plant
下载PDF
导出
摘要 对比某1×30 MW生物质电厂和目前国内同级别电厂,总结该项目主厂房布置的主要特点为:取消炉前中间料仓;汽机房0 m低位布置;锅炉房与主厂房并列布置。该项目主厂房的布置方案对类似规模生物质发电机组的设计有借鉴意义。 Comparing the main building arrangement of a 1 x 30 MW Biomass power plant with that of the same level plants in China, features of the main building arrangement are summarized as follows: the middle bunker in front of the furnace is removed, the steam turbine house is arranged at low position of 0m ; boiler house and main building are arranged in parallel. The arrangement scheme of the main building provides a reference for the design of biomass power plant of similar scale.
作者 万立
出处 《广西电力》 2013年第4期82-83,共2页 Guangxi Electric Power
关键词 1 × 30 MW生物质电厂 主厂房布置 中间料仓 0 m低位布置 并列布置 1 x 30 MW biomass power plant, main building arrangement, 0 m low
  • 相关文献

参考文献1

  • 1GB50762-2012,秸秆发电厂设计规范[s].

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部