期刊文献+

临沂市老城区初期雨水污染调蓄工程方案 被引量:1

Storage Scheme for Initial Rainwater Pollution Control in Old Urban Area of Linyi City
原文传递
导出
摘要 如何根据城市降雨规律及区域情况选择调蓄方式,对初雨调蓄工程设计运行及工程效益都有着重要意义。通过对临沂市5年多的降雨资料及初雨水质监测分析,结合现状已建设施及区域情况,对规划区域总体初雨解决方案进行布局,并对近期小涑河调蓄方案进行详细比选,得出相关结论及建议,给相关雨水调蓄工程提供参考。 In initial rainwater storage engineering and design, selecting storage methods based on urban rainfall principles and regional situations is vital. By analyzing 5-year rainwater quality data for Linyi City and based on present constructed facilities and regional situations, the layout of a general scheme for initial rainwater control in the planned area was performed. Detailed comparison and selection of Xiaosu River storage scheme were carried out. Related conclusions and suggestions were obtained to provide reference for related rainwater storage projects.
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第19期151-154,共4页 China Water & Wastewater
关键词 临沂市 调蓄池 调蓄管 初雨治理 Linyi City storage pond storage pipe initial rainwater treatment
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献14

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部