摘要
介绍对水电站主厂房通风系统实施改造的具体做法 ,就如何解决坝后封闭式厂房通风问题进行探讨。
How to solve the problem in ventilation in enclosed building at dam toe is discussed in this paper, and renovation of the ventilation system in main building is exprounded as well.
出处
《西北电力技术》
2000年第5期44-45,共2页
Northwest China Electric Power
关键词
水电站
主厂房
通风系统
技术改造
hydropower station ventilation of main building renovation