悬臂施工连续梁桥顶板预应力束平弯段径向力效应 被引量:1

EFFECT OF RADIAL FORCE CAUSED BY HORIZONTAL BEND OF PRESTRESSING TENDONS IN TOP FLANGE OF CONTINUOUS BOX GIRDER BRIDGE
原文传递
导出
摘要 平面杆系模型无法考虑预应力束平弯效应的影响,三维实体模型的建立又过于复杂。针对此问题,该文以悬臂施工连续箱梁顶板为研究对象,推导了顶板中轴线处平弯束径向力效应引起的拉应力的弹性力学解。基于拉应力最大值往往是设计控制点,提出了等效宽度的概念,对弹性力学解进行进一步简化。最后,借助ANSYS软件进行算例验证。结果表明,随着平弯半径的增大,曲率逐渐减小,级数解推导过程中由平弯束"以直代曲"造成的误差逐渐减小,增加修正项以考虑平弯束斜率改变的影响后,数值解与公式解趋于一致,即简化后的公式是行之有效的。 The influence of radial force caused by horizontal bend of prestressing tendons can't be taken into account in planar member models. The solid models, in which the influence could be reflected, are complicated in modeling process. To solve this problem, an elasticity formula on tensile stress at medial axis is proposed in this paper, which can be applied to the top flange of continuous box girder. Then the concept of equivalent width is suggested to further simplify the elasticity formula based on the idea that the maximum tensile stress is always the control point in the design process. Finally, it is verified by numerical experiment with the aid of ANSYS software. The analysis results indicate that the errors caused by "Drawing Curves by Straight Lines" in the derivation process decrease gradually with the increase of horizontal bend radius. Furthermore, numerical solutions and formula solutions tend to be identical after a correction term is introduced to take the influence of trend change of prestressing tendons into consideration, that is, the simplified calculation formula is practical.
作者 仲济涛 刘钊
出处 《工程力学》 EI CSCD 北大核心 2013年第9期89-94,共6页 Engineering Mechanics
基金 江苏省交通科学研究计划项目(2011Y33)
关键词 桥梁 悬臂施工 平弯束 径向力 纵向裂缝 bridge cantilever construction horizontal bend radial force longitudinal crack
  • 相关文献

参考文献19

  • 1Podolny W, Muller J M. Construction and design of prestressed concrete segmental bridges [M]. New York: John Wiley & Sons Inc, 1982: 35-41.
  • 2Mondorf P E, Kuprenas J A, Kordahi E N. Segmental cantilever bridge construction case study [J]. Journal of Construction Engineering and Management, 1997, 123(1): 79-84.
  • 3Iglesias C. Long-term behavior of precast segmental cantilever bridges [J]. Journal of Bridge Engineering, 2006, 11(3): 340-349.
  • 4Bishara A G, Papakonstantinou N G. Analysis of cast-in- place concrete segmental cantilever bridges [J]. Journal of Structural Engineering, 1987, 116(5): 1247- 1268.
  • 5兰晓红.现浇箱梁桥预应力钢束顶板张拉和腹板张拉方案比较[J].福建建设科技,2010(5):27-29. 被引量:3
  • 6舒长征,莫金明,吴先树.连续刚构桥中跨跨中底板崩裂原因分析与加固措施[J].交通科技,2008,18(2):19-21. 被引量:6
  • 7Iyengar K T. Two-dimensional theories of anchorage zone stresses in post-tensioned prestressed beams [J]. American Concrete Institute, 1962, 59(10): 1443- 1466.
  • 8Galic M, Marovic P. Modified mohr-coulomb,rankine material model for concrete [J]. Material Model for Concrete, 2011, 28(7): 853-887.
  • 9Iyengar K T. A three dimensional elasticity solution for rectangular prism under end load [J]. Zeitschrift Fur ill Angewandte Mathematik Und Mechanik, 1969, 49(6): 321 -332.
  • 10Iyengar K T, Rabhakara M. Anchor zone stresses in prestressed concrete beams [J]. ASCE Journal of the Structural Division. 1971.97(3): 806- 825.

二级参考文献10

  • 1郑克仁,孙伟,张云升,金祖权,赵庆新.混凝土疲劳裂缝的研究[J].武汉理工大学学报,2006,28(8):39-42. 被引量:9
  • 2中华人民共和国交通部.JTGB01-2003公路工程技术标准[S].北京:人民交通出版社,2004.
  • 3福建省交通规划设计院.国道主干线福州绕城公路西北段RA5合同段两阶段施工图设计[M].福州:2007.
  • 4福建省交通规划设计院.福州长乐国际机场高速公路二期工程A6合同段两阶段施工图设计[M].福州:2007.
  • 5王宏义.混凝土疲劳损伤研究综述[J].山西建筑,2007,33(18):74-75. 被引量:7
  • 6JTJ041-2000公路桥涵施工技术规范[S].北京:人民交通出版社,2000.
  • 7JTGD62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S],北京:人民交通出版社,2004.
  • 8中华人民共和国交通部.JTGD62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,2004.
  • 9中华人民共和国交通部.JTGD60-2004公路桥涵设计通用规范[S].北京:人民交通出版社,2004.
  • 10熊锋,康良桢.惠河高速东江大桥连续箱梁施工与控制[J].中南公路工程,2001,26(3):51-53. 被引量:4

共引文献8

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部