核电站涂装国产化管理研究 被引量:1

Study on Coating Localization Management in Nuclear Power Plant
下载PDF
导出
摘要 在对国内核电机组涂装配套体系进行全面调研后,结合国内核电站涂装管理的现状,就核电站涂装国产化的可行性、关键点、类别进行了具体分析。为落实涂装国产化管理,需设计单位、涂料供应商、涂装施工管理单位进行协作。设计单位需明确涂装技术文件、核电站运行安全要求、涂层性能试验要求;涂料供应商应落实资格申报、涂料试验、合格供货;涂装施工管理单位应对施工质保、涂料检查与仓储、涂装施工过程实施有效管理。 After a survey on coatings systems for nuclear power plants in China, the t^asi- bility and key points of coating localization management were analyzed based on current coating management status and levels. For implementation of the coating loealization management, closed collaborations were necessary among coating designer, coatings supplier and application management institution, including defining the coating technical specification amt safety opera- tion requirements and required tests for coatings by the designer, implement of a qualification application and coatings tests and supply of qualified products by the coatings supplier, and quality assurance and site verification and satisfied storage & process control by the application management instituion.
作者 张耀
出处 《涂料工业》 CAS CSCD 北大核心 2013年第10期58-63,共6页 Paint & Coatings Industry
关键词 核电站 涂装 国产化 nuclear power plant coating localization
  • 相关文献

参考文献4

  • 1NRC. Regulatory guide 1.54 -service level I, II and III protective coatings applied to nuclear plants [ EB/OL ]. [2013 -03 -01]. http://pbadupws, nrc. guy/does/ MII)O37/MLO03739156. pdf.
  • 2ISO 12944. Paints and varnishes -corrosion protection of steel structures by protective paint systems [ S ]. Switzer- land : International Organization for standardization, 1998.
  • 3国家质量技术监督局.GB/T9286色漆和清漆,漆膜的划格试验[S].北京:中国标准出版社,1998.
  • 4NRC. 10CFR50 appendix B, quality assurance criteria for nuclear power plants and fuel reprocessing [ EB/OL ]. [ 2013 -3 - 1]. http ://www. nrc. gov/reading - rm/doc - collections/cfr/part050/part050 - appb. html.