期刊文献+

多约束下舰船装备携行备件保障方案优化方法 被引量:27

Optimization Method of Carrying Spare Parts Support Project for Warship Equipment under Multi-constraints
下载PDF
导出
摘要 针对装备携行备件方案的确定需要综合考虑多项约束指标,以出航任务准备阶段的随舰携行备件方案配置规划为研究背景,在备件质量、体积、费用以及装备可用度4项指标约束下,建立携行备件方案的配置优化模型。通过引入拉格朗日约束因子将各项指标转化为资源规模约束,采用边际算法对模型进行求解,并提出了初始约束因子的确定方法及其动态更新策略。通过对算例结果进行分析,验证了该研究方法的可行性。 Due to the restriction of carrying ability and storage space for support resources, the multi-con- straints targets must be considered for the optimization of a carrying spare parts project. As to this prob- lem, the optimization of warship carrying spare parts project at mission preparation phase before sailing is taken as a research background. A carrying spare parts optimization model is established on the basis of the muhi-target constraints, such as mass, volume and cost of spare parts and equipment availability. The different constraint targets are transformed to the scale of spare parts resource constraint by introdu- cing Lagrange constraint factors. Marginal algorithm is applied to solve the optimization model, and the determination method of initial factors and its dynamic adjustment policy is presented. In the given exam- ple, the calculated result is analyzed, and the feasibility of the proposed method is verified.
出处 《兵工学报》 EI CAS CSCD 北大核心 2013年第9期1144-1149,共6页 Acta Armamentarii
基金 总装备部"十二五"预先研究项目(51304010206 51327020105)
关键词 运筹学 舰船装备 备件 多约束 配置优化 边际算法 可用度 operations research warship equipment spare part multi-constraint configuration optimi- zation marginal analysis availability
  • 相关文献

参考文献7

二级参考文献88

  • 1黎放,费奇,王威.武器装备可靠性费用研究[J].系统工程与电子技术,2005,27(7):1253-1255. 被引量:12
  • 2Bachman T C, Kline R C. Model for estimating spare parts requirements for future missions[R]. AIAA-2004-5978, 2004.
  • 3Fisher M L. The Lagrangian relaxation method for solving integer programming problems[J]. Management Science, 1981, 27(1): 1 - 18.
  • 4Sherbrooke C C. Optimal inventory modeling of systems, multiechelon techniques[M]. 2nd. Boston: Kluwer, 2002: 34-42.
  • 5Diaz A. Multi-echelon inventory models for repairable items[D]. College Park:Maryland University, 1995.
  • 6Wong H, van Houtum G J, Cattrysse D, et al. Multiitem spare parts systems with lateral transshipments and waiting time eonstraints[J]. European Journal of Operational Research, 2006, 171(3) :1071 -1093.
  • 7Kennedy W J, Patterson J W, Fredendall I. D. An overview of recent literature on spare parts inventories[J].Int J Production Economics, 2002, 76(2):201-215.
  • 8Sherbrooke C C. Metric: a multi-echelon technique for recoverable item control[J]. Operations Research, 1968, 16 (1) : 122-141.
  • 9Sherbrooke C C. VARI-METRIC: improved approximation for multi-indenture, multi echelon availability models [J]. Operations Research, 1986, 34(2):311-319.
  • 10Alfredsson P. Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities [J].European Journal of Operational Research, 1997,99 (3) : 584-595.

共引文献154

同被引文献256

引证文献27

二级引证文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部