摘要 风力发电机组载荷测试是涉及到风电机组寿命与安全的、重要的型式认证试验项目之一。载荷测试的主要内容是对风电机组塔筒、主轴、叶片等主要结构部件的弯矩(扭矩)进行测试。叶根弯矩测试采用传统的粘贴应变片和搭建惠斯通电桥的方式。由于叶片本身结构及材料特性复杂,因此传统的旁路电阻标定的方法不适用于叶片根部弯矩信号的标定。结合实际测试项目,文章介绍了几种常用的叶片根部弯矩信号标定方法,并分析了各自的特点。 Wind turbine load measurement is one of the most significant type approval certification issues, which is related to the wind turbine life and safety. The main content of the wind turbine load measurement is the bending moment measurement of main part, such as tower, main shaft and blades. The strain gauges and Wheatstone bridge are used to take the blade root bending moment measurement. For the blade root bending signal calibration, due to the complicated structure and material, the tradi- tional shunt calibration method is not available. In this article, three kinds of methods of blade root bending signal calibration and their characteristics are introduced and analyzed within the measure- ment project.
出处 《可再生能源》 CAS 北大核心 2013年第10期62-64,69,共4页 Renewable Energy Resources
基金 国家能源局应用技术研究及工程示范项目(NY20110404-1)
关键词 型式认证 载荷测试 叶根弯矩信号标定 type approval certification load measurement blade root bending signal calibration
  • 相关文献

参考文献7

  • 1IEC 61400-1-2005, Wind turbines partl: design requirements [S].
  • 2IEC 61400-13-2001, Wind turbines generator sys- tems-part 13 : measurement of meehanieal loads[S].
  • 3薛扬,付德义,焦渤,等.一种符合IEC61400—13标准的风电机组载荷测试系统[P].中国专利:201010513594,2011-02—16.
  • 4付德义,薛扬,秦世耀.MW级风力发电机组载荷测试方法研究[J].可再生能源,2013,31(3):65-68. 被引量:17
  • 5IEC 61400-12-1-2005,Wind turbines part 12-1: power performance measurements of electricity produc- ing wind turbines[S].
  • 6IEC 61400-22-2010, Wind turbines part 22 : conformity testing and certification IS].
  • 7IEC TS 61400-23-2001, Wind turbines generator systems- part 23: full scale structural testing of rotor blades [S].

二级参考文献7

  • 1中国可再生能源学会风能专业委员会.2010年中国风电产业发展现状[J].风能,2010(2):40.
  • 2IEC 61400-1-2005,Wind turbines Part1: Design re- quirements[S].
  • 3IEC 61400-13-2001 ,Wind turbines generator systems- Part 13: Measurement of mechanical loads[S].
  • 4IEC 61400-12-1-2005, Wind turbines Part 12-1: Power performance measurements of electricity produc- ing wind turbines[S].
  • 5IEC 61400-22-2010, Wind turbines Part 22: Confor- mity testing and certification [S].
  • 6IEC TS 61400-23-2010, Wind turbines generator sys- tems- Part 23: Full scale structural testing of rotor blades [S].
  • 7魏玉通,田德,王海宽,王丽丽,许明,董正茂.风力发电机叶片动态载荷分析[J].农村牧区机械化,2009(1):17-20. 被引量:5