外生不确定条件下水利BOT项目特许期决策研究 被引量:3

A Study of The Decision-making of the Concession Period for Water Conservancy BOT Project Under Exogenous Uncertainties
下载PDF
导出
摘要 特许期作为水利BOT项目融资决策中的核心问题,其合理性在很大程度上决定了项目成功与否。通过分析影响水利BOT项目特许期决策的外生不确定因素,建立折现现金流量模型(DCF),利用蒙特卡洛进行模拟并确定特许期区间,最后通过算例进行分析,说明该决策方法可以将水利项目风险合理的分摊给项目公司与政府,对水利BOT项目特许期的决策更具公平合理性。 Concession period is a critical issue in water conservancy BOT project financing, the rationality of the concession period largely determines the success of the project. This paper establishes a Discounted Cash Flow model (DCF) by analyzing the exoge- nous uncertainties that affect the decision-making of water conservancy BOT project concession period, and Monte Carlo simulation is used to determine the range of the concession period. Finally, this paper uses an example to draw a conclusion that the decision-mak- ing method can share the risk of the water conservancy project to the project company and the government reasonably. Besides, it is more fair and reasonable for the concession period decision-making of the water conservancy BOT project.
机构地区 河海大学商学院
出处 《中国农村水利水电》 北大核心 2013年第9期173-176,共4页 China Rural Water and Hydropower
基金 中央高校基金(2013B07814)
关键词 水利BOT项目 特许期 外生不确定性 Crystal BALL water conservancy BOT project concession period exogenous uncertainty crystal ball
  • 相关文献

参考文献8

二级参考文献29

共引文献46

同被引文献21

  • 1吉兴全,文福拴.发电投资的实物期权决策方法[J].电力系统自动化,2005,29(11):1-5. 被引量:50
  • 2水利水电规划设计总院.水利建设项目经济评价规范[S].1994
  • 3MYERS S C,TURNBULL S M. Capital budgeting and the capital asset pricing model: good news and bad news[J]. The Journal of Finance,1977,32(2):321 -333.
  • 4LIU J, CHEAH C Y J. Real option application in PPP/ PFI project negotiation [ J ]. Construction Management and Economics,2009,27(4) :331 - 342.
  • 5ESPINOZA D, MORRIS J W F. Decoupled NPV:a sim- ple improved method to value infrastructure invest- ments [ J ]. Construction Management and Economics, 2013,31 (5) :471 -496.
  • 6ROBICHEK A A, MYERS S C. Conceptual problems in the use of risk - adjusted discount rates [ J ]. The Journal of Finance, 1966,21 (4) :727 -730.
  • 7ESPINOZA R D. Separating project risk from the time value of money: a step toward integration of risk man- agement and valuation of infrastructure investments [J ]. International Journal of Project Management, 2014,32(6) : 1056 - 1072.
  • 8EMBRECHTS P. Actuarial versus financial pricing of insurance[J]. Journal of Risk Finance, 2000,1 (4) : 17 - 26.
  • 9标准定额研究所.市政公用设施建设项日经济评价方法与参数[M].北京:中国计划出版社.2009.
  • 10深圳市水务规划设计院.布吉水质净化厂改造工程可行性研究报告[R].2014.

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部