根据该开发区热负荷发展,结合区域内主热源建设进度,结合环保与节能需要提出合理的建设方案。
According to the development zone heat load development, combined with regional main source construction schedule, combined with environmental protection and energy saving need to put forward reasonable scheme.
出处
《林业科技情报》
2013年第3期51-53,共3页
Forestry Science and Technology Information
关键词
热电厂
调峰
备用
循环流化床
往复炉排
热水锅炉
thermal power plant
peak - shaving
reserve
circulating fluidized bed
reciprocating grate