中天山隧道涌水处治技术

Water Gushing Treatment Technique for Zhongtianshan Tunnel
下载PDF
导出
摘要 中天山隧道特大高压涌水段具有水头压力大、持续时间长、涌水量大的特点;文章研究了涌水产生的机理,制定并实施了泄水减压结合帷幕注浆堵水的施工方案,快速有效地通过了特大高压涌水地质灾害洞段,效果显著。 Zhongtianshan tunnel's high pressure water gushing section had unique features such as high pressure at water head, long duration period and large gushing amount. This article probed into the generation mechanism of water gushing and drew up a feasible construction plan for water plugging by combining the efforts of draining and curtain grouting. This plan was applied to the construction of Zhongtianshan tunnel's high pressure water gushing section effectively. As a result, the construction was completed smoothly and a remarkable result was reached.
出处 《现代交通技术》 2013年第4期53-57,共5页 Modern Transportation Technology
关键词 隧道工程 涌水 帷幕 注浆 tunnel engineering water gushing curtain grouting
  • 相关文献

参考文献7

  • 1中铁第一勘察设计院.中天山隧道地质报告[R].西安:中铁第一勘察设计院,2009.
  • 2TB10012-2007,铁路工程地质勘察规范[S].
  • 3TB10049-2004,铁路工程水文地质勘察规范[S].
  • 4常士骠,张苏民.工程地质手册(第四版)[M].北京:中国建筑工业出版社,2007.
  • 5J449—2005 TB10003—2005 铁路隧道设计规范[S].
  • 6J163—2002TB10204—2002 铁路隧道施工规范[S].
  • 7刘海京,黄伦海,张学强,丁浩.平阳隧道突泥涌水灾害处治设计与施工[J].公路交通技术,2011,27(6):93-98. 被引量:11