摘要
结合国贸二期结构施工,详细阐述了高层钢结构的施工,柱、梁的吊装方法和安装工艺,钢结构安装测量技术,钢结构施工现场焊接技术及高强度螺栓的施工工艺,为类似工程的施工控制提供了有益的借鉴和参考。
Taking the steel structure construction in the second stage of China World Trade Center Tower as the example, this paper elaborates steel structure construction of high-rise in detail, including the installation process and lifting methods of columns and beams, installation and measurement techniques, site welding technology and construction of high strength bolts, which can provide a useful reference for construction quality control of relevant construction projects.